writing on the floor {boys’ loft}

Slow. Slow. Slow. Our progress on the boys’ sleeping loft is moving at a painfully slow pace. Working on the loft also means changing the bottom half of their room. This month the window company will be installing a window in the loft and then we can make progress a little faster – I hope.

Here is the current state of things:

We will trim out this hole entrance. It looks rough right now, but there is a plan!3.15loftfloor-002There will also be a railing up here, a window, a fire escape ladder, outlet covers…all the safe stuff before the boys move up here. Don’t worry!3.15loftfloor-003Chris told the boys they could write on the plywood flooring before he installed the laminate wood floor. I was cracking up reading all they wrote. I took pictures of it all – some of it I wish we didn’t have to cover up! It is always good to be reminded you should love your siblings even if they make you mad 🙂3.15loftfloor-005This little girl came back up to add one more thing…3.15loftfloor-0063.15loftfloor-0073.15loftfloor-0083.15loftfloor-009“When I am a teenager I hope I get the loft!” She’s already dreaming.3.15loftfloor-010

Prev Post

1 minute of his 11th birthday

March 5, 2015

Next Post

#rough_housing {The Parker's Main Street Home}

March 10, 2015